Monday, December 3, 2007

Progress of the cabin as of 12/3/07

Main floor done...ready for the walls which will be the logs!!


Looks like inside walls to me???

A view from the front of the cabin looking back



Side of the cabin


The logs are nearly up on the main floor...the ground floor cannot be seen from here as it is on a lower level with a separate entrance from lower down the mountain.

No comments: